But they know no matter what they do, they cannot prevent all seamen deaths. So they must devise a way to show that, when that catastrophe happens, they have done everything they could to prevent it. They require detailed analyses showing that any possible mistake or failure by man or machine will not result in a seaman death.
They require that all vendors go through an expensive and restrictive certification process. The yard is no longer free to bid anyone it wants to. Newcomers need not apply. The incumbent vendors enjoy a deep regulatory moat. Their focus becomes maintaining the paperwork required to preserve that moat. Cost is determined by amount of paperwork not quality.
The OSD writes detailed process requirements dictating just how components will be manufactured and who can do that work. They imposes multiple layers of paperwork documenting that all their procedures have been followed. Any change has to go through a long list of sign offs, requiring reanalysis of anything that might be affected. How long these approvals will take is anybody's guess.
They instruct their inspectors to reject any departure from an approved drawing no matter how trivial or beneficial. If an OSD inspector does not show up for a required test, the test has to wait until he does.
What do you think will happen to our shipyard's productivity? I can tell you what will happen. The carefully choreographed system will be thrown into chaos, and grind to a virtual halt. Cost will increase by an order of magnitude or more. Quality will deteriorate drastically. The ships will be delivered years late. They will rarely perform to spec, some will not perform at all.
Why can I tell you what will happen? US naval shipyards resemble Korean yards on the surface but they are controlled by something that looks very much like the OSD system. In fact, the OSD system is modeled on the Navy system. I spent the first decade or so of my career, working within this system. I saw the focus on process rather than substance. I saw the waste. I saw inexplicable decisions go unchallenged. I saw obvious errors turned into profit centers. I saw promotions based not on output, but on keeping the paperwork clean. I saw horribly bloated initial prices followed by enormous overruns. I saw schedules busted by months and then by years. I saw ships that did not work. I saw everybody involved stridently defend the system.
Thank God the OSD does not run nuclear power. We'd have no chance of solving the Gordian Knot.